The preparatory work before the installation of Acrion countertops is directly related to the final effect and service life. It needs to be systematically advanced from three dimensions: basic conditions, materials and tools, and construction planning. The following are the specific key points:
First, confirmation of basic conditions
Acceptance of cabinet structure
Check the flatness and levelness of the cabinet, and the error should be controlled within ±2mm. If the cabinet is tilted or deformed, it is necessary to adjust it in advance with gaskets or leveling feet. Otherwise, stress concentration is likely to occur after the countertop is installed, which may lead to the risk of cracking.
Confirmez la capacité de charge de l'armoire, en particulier compte tenu de la capacité de charge après avoir installé des éviers et des poêles sur le comptoir pour éviter la déformation causée par une charge insuffisante.
Lignes réservées en eau et en électricité
Marquez les positions d'installation des équipements tels que les éviers, les poêles et les robinets en fonction des dessins de conception, et assurez-vous que les interfaces des lignes d'eau et d'électricité (telles que le tuyau de vidange de l'évier et l'alimentation de la cuisinière à gaz) correspondent précisément aux positions des ouvertures sur le comptoir.
Vérifiez l'étanchéité des interfaces du circuit pour éviter les infiltrations potentielles d'eau ou les fuites électriques après l'installation.
Contrôle de la température et de l'humidité de l'environnement
La température de l'environnement d'installation doit être maintenue entre 5 ℃ et 35 ℃, et l'humidité doit être inférieure à 80%. La température et l'humidité extrême peuvent provoquer un durcissement anormal de la colle ou de l'expansion thermique et de la contraction du comptoir.
Si la zone d'installation est un espace non clos, des mesures de blindage temporaire doivent être prises pour empêcher la période de construction par la période.
Deuxièmement, la préparation des matériaux et des outils
Inspection des comptoirs et accessoires
Vérifiez si la taille, la couleur et l'épaisseur du comptoir sont cohérentes avec la conception et inspectez la surface pour toutes les rayures, les fissures ou les différences de couleur.
Confirm the integrity of the accessories, including the splicing adhesive, support gaskets, sealing strips, fixing clips, etc., to avoid construction interruption due to missing accessories.
Tool adaptability
The cutting tools should be equipped with dedicated saw blades (diamond saw blades or high-density alloy saw blades) to ensure that the cutting edge is smooth and free of burrs.
The grinding tool should be selected with sandpaper that matches the material of the countertop (120 mesh for rough grinding and 800 mesh or above for fine grinding) to avoid surface damage caused by excessive grinding.
Anti-rust screws or special clips should be used to fix the tools to prevent the metal parts from corroding and polluting the countertop after long-term use.
Reserve of auxiliary materials
Prepare masking tape or protective film to cover the non-construction areas of the countertop to prevent contamination by glue or dust.
Equipped with a neutral cleaner and a soft cloth for immediate cleaning of the countertop after construction to prevent residue from solidifying.
Third, construction planning and personnel preparation
Installation process design
Clarify the construction sequence: First, fix the support strips, then hoist the countertop, and finally carry out splicing and edge finishing.
Plan the opening time: The holes for the sink and stove should be cut after the countertop is fixed to avoid opening deviations caused by the movement of the countertop.
Personnel division of labor and training
Désignez une personne spécifique pour être responsable des liens clés tels que la mesure, la coupe et l'épissage pour assurer la précision opérationnelle.
Avant la construction, un briefing technique doit être effectué pour clarifier la quantité d'utilisation de l'adhésif d'épissage, le temps de durcissement, le processus de finition du bord et d'autres normes.
Formulation des plans d'intervention d'urgence
Pour des problèmes possibles tels que les écarts dimensionnels et les dommages causés par les matériaux, préparez les comptoirs de rechange ou les matériaux de réparation à l'avance.
Confirmez la fenêtre de temps de construction pour éviter les interruptions de construction causées par l'intersection d'autres processus.
Quatrièmement, points clés pour noter
Protection contre le comptoir
Lors du transport et du stockage, il doit être placé horizontalement pour éviter les dommages cachés au comptoir en raison de la force inégale.
Pendant la période de construction, il est strictement interdit d'empiler des objets lourds ou de marcher sur le comptoir pour empêcher les indentations de surface.
Spécifications d'utilisation pour l'épissage adhésif
L'adhésif d'épissage doit être mélangé dans la proportion spécifiée dans le manuel. Le temps d'agitation ne doit pas être inférieur à 3 minutes pour assurer l'effet de durcissement.
Un espace de 2 à 3 mm doit être réservé à la partie d'épissage. Après être rempli de colle, il doit être fixé avec des luminaires. Le temps de durcissement devrait atteindre plus de 24 heures.
Exigences du processus de finition des bords
Les bords du comptoir doivent être polis pour être lisses. Le joint entre la bande de bord et le comptoir doit être rempli de scellant pour empêcher la vapeur d'eau de s'infiltrer.
Le processus d'épissage de 45 ° doit être utilisé dans le coin pour assurer la cohérence visuelle.
Grâce aux préparations ci-dessus, les risques d'installation peuvent être effectivement réduits et l'attrait esthétique global et la durée de vie du comptoir peuvent être améliorés. L'équipe de construction doit suivre strictement les procédures et effectuer des auto-inspections de qualité après chaque étape pour s'assurer que l'effet final répond aux attentes.